Cockburn Coast Oval, Shoreline

TABEC are very pleased to have provided the civil engineering design, construction support and contract administration for the recently completed Cockburn Coast Oval earthworks and servicing of the site at Shoreline Estate for DevelopmentWA.

The oval design and construction was heavily constrained by an intimate proximity with the existing heritage listed Robb Jetty Abattoir Chimney Stack and over 25 heritage fig trees which remain as a testament to the near century old industry which previously operated in the area. Congratulations to both DevelopmentWA and Densford Civil for delivering a high quality outcome which also delivers essential servicing to enable future development of oval and community centre assets.

Salt Lane Precinct, Shoreline

Shared-Zones at Shoreline – Salt Lane Precinct Construction of Stage 3 at DevelopmentWA’s Shoreline estate was recently completed to deliver high-quality residential outcomes for innovative micro-lot housing product, incorporating numerous shared zones, public open space and connectivity elements. The Salt Lane precinct exhibits numerous shared-zone networks which were designed to accommodate safe, integrated movement of vehicles, cyclists and pedestrians to promote activation of the road reserves to enhance the public amenity, connectivity and accessibility to nearby public open space.

The shared-zone and activated streetscape outcomes were achieved through strong collaboration with the landscape and building architects early during the detailed design of the precinct, which ultimately led to greater opportunity to implement key innovations as well as the pre-determination of otherwise obstructive service locations to accommodate proposed built form outcomes.