December 2021 saw Densford Civil complete the remediation of the Shoreline Stage 4 site through meticulous excavation and validation of a vast area previously impacted by previous land use as a rail siding.

The design of the civil open space was progressively revised throughout the construction process to respond to a continually evolving scope of remediation to ensure the proposed residential sites were satisfactorily validated. The bulk earthworks operation involved chasing out over 15,000 m3 of material adjacent to a live freight rail corridor, which was appropriately capped and validated through daily environmental testing of ground conditions.

TABEC look forward to providing engineering and superintendence services for the upgrade of primary estate roads and relocation of key infrastructure to unlock further development during 2022.